Hong Kong contact. Mainland China manufacturing.
Mini UPS

4T Timed Mini UPS

Reference: 4T

Input-loss and preset-stop timing diagram; actual backup time is not specified
Operating principle illustration, not a model photograph. Confirm the selected implementation.

4T timed mini UPS reference for preset backup operation followed by shutdown, with a listed Ni-MH battery. Timing and electrical configuration require review.

Output
Confirm output specification
Power
Current rating requested
Battery
Nickel-metal hydride (Ni-MH)

Sample availability, pricing and shipping are confirmed for your configuration.

Specifications

4T Timed Mini UPS specifications
ParameterStated value
Reference code 4T
Equipment type Timed mini UPS
Backup control Preset operating period followed by automatic shutdown
Input recovery behavior Returns to standby if AC input recovers during backup
Battery type Nickel-metal hydride (Ni-MH)

Values are taken from manufacturer documentation and apply to the listed configuration. Confirm the current model-specific document, conditions and revision before procurement.

Integration notes

Protected load and backup behaviour

Describe the equipment to protect, normal and startup demand in W and VA, selected AC or DC output, and the required backup period. Include the connector, polarity, cable and installation requirements for a configuration review.

Application notes & selection checklist

Use 4T to open a documentation enquiry for a preset backup period followed by automatic shutdown. The source describes a Ni-MH battery and return to standby if AC input recovers during backup.

Describe the equipment’s shutdown sequence, load, output requirements and timing tolerance. Request current electrical ratings, battery capacity and timing documentation, then agree tests for input loss, recovery and low-battery behaviour. Battery protection may stop output before the preset period ends.

Start a timing and configuration review through the mini UPS directory.

Output, connection & branding options

Discuss the required output voltage, connector and polarity, cable length, enclosure labelling and packaging. Alarm outputs, dry contacts or other monitoring interfaces require a model-specific feasibility check. Confirm the configuration and test load before sample evaluation.

How we approach validation

Documentation

Electrical, battery & shipping documents

Request the current electrical specification, connector information and battery nameplate. For lithium-battery shipment review, include the applicable UN 38.3 test summary and safety data sheet; packaging, route and carrier acceptance are confirmed before dispatch.

Request UPS documentation